{"id":13860,"date":"2026-03-30T12:59:02","date_gmt":"2026-03-30T12:59:02","guid":{"rendered":"https:\/\/enviroprocess.com\/?post_type=reference&#038;p=13860"},"modified":"2026-05-04T14:03:48","modified_gmt":"2026-05-04T14:03:48","slug":"nye-toyenbadet","status":"publish","type":"reference","link":"https:\/\/enviroprocess.com\/en\/reference\/nye-toyenbadet","title":{"rendered":"T\u00f8yenbadet"},"content":{"rendered":"<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Indoor and outdoor swimming pools<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The developer: <strong>Municipality of Oslo<br><\/strong>Main contractor pools and water treatment: <strong>ENWA <\/strong>Bathing facilities \/ <strong>Enviroprocess Norway AS<br><\/strong>Architect: <strong>ASPLAN VIAK<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.oslo.kommune.no\/natur-kultur-og-fritid\/svommehaller-i-oslo\/toyenbadet\/\" target=\"_blank\" rel=\"noopener\">Toyenbadet<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\">The new T\u00f8yenbadet swimming pool in Oslo is one of Norway's largest swimming facilities. Construction began in 2022 and the facility was largely completed in 2025. <br><br>The facility has a total of 10 pools: indoor section with 50 x 25 m competition pool, diving pool with 1, 3 and 5 m diving boards, training pool 12.5 x 9 m with raised\/lowered bottom, children's pool, warm pool, family pool and outdoor section with all-year pool, children's pool, family pool, 25 m swimming pool and diving pool with 1, 3 and 5 m diving boards.<br><br>Several of the pools, all made of acid-proof steel, are equipped with massage systems, water features and underwater lighting<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Generally speaking, after oil platforms, the construction of bathing facilities is one of the most complicated things you can build. Due to its size and scope, the new T\u00f8yenbadet was very demanding to complete. As a company, we are proud to have completed this project both on time and without overruns (for our share of the project).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Deliverables from ENWA \/ Ennviroprocess:<\/strong><br><br>- Access system with ticketing<br>- Cloakroom facilities<br>- Tyre equipment (starting pallets, track separation ropes, diving boards, ladders, etc.)<br>- Automatic bottom suction devices<br>- Raising \/ lowering bunker<br>- Underwater lighting<br>- Footbath<br>- All pools in acid-proof steel<br>- Water slides<br>- Water traction<br>- Water treatment plants<br>- Chlorine production plants<br>- Water and energy recovery facilities<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Tasks performed:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">- Design and 3D modelling of steel pools, water treatment plants, pool equipment and changing facilities.<br>- Supply, installation and commissioning of steel pools, with associated equipment, treatment plants, recovery systems, chlorine production plants, automation, etc.<br><br>Supply and installation of:<br>- 10 steel pools, <br>- 2 water slides, <br>- 3 foot baths,<br>- 8 wastewater treatment plants<br>- cloakroom facilities <br>- access system.<br><br><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Innend\u00f8rs-og utend\u00f8rsbasseng Byggherre: Oslo kommuneHoved entrepren\u00f8r bassenger og vannbehandling: ENWA Badeanlegg \/ Enviroprocess Norway ASArkitekt: ASPLAN VIAK Toyenbadet Nye T\u00f8yenbadet i Oslo er et av Norges aller st\u00f8rste badeanlegg. Byggingen ble p\u00e5begynt i 2022 og anlegget var i hovedsak ferdigstilt i 2025. Anlegget har totalt 10 bassenger: innedel med 50 x 25 m konkurransebasseng, stupebasseng [&hellip;]<\/p>\n","protected":false},"featured_media":14117,"parent":0,"menu_order":0,"template":"","meta":{"_acf_changed":false},"categories":[15],"class_list":["post-13860","reference","type-reference","status-publish","has-post-thumbnail","hentry","category-publika_bad"],"acf":[],"_links":{"self":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/reference\/13860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/media\/14117"}],"wp:attachment":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/media?parent=13860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/categories?post=13860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}