{"id":9495,"date":"2024-10-25T07:22:12","date_gmt":"2024-10-25T07:22:12","guid":{"rendered":"https:\/\/enviroprocess.com\/?post_type=product&#038;p=9495"},"modified":"2025-08-06T10:35:22","modified_gmt":"2025-08-06T10:35:22","slug":"water-treatment-contracting","status":"publish","type":"product","link":"https:\/\/enviroprocess.com\/en\/product\/water-treatment-contracting","title":{"rendered":"Turnkey contract in water treatment for baths and spas"},"content":{"rendered":"<h1 class=\"wp-block-heading\">Investigations with a focus on function &amp; performance<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>At EnviroProcess, we listen, analyse, act and always adapt our solutions to our customers' needs. Through our engineering investigations, we lay the foundation for how to ensure that your particular bathing facility works and performs optimally over time. We ask the right questions and always work closely with our customers. It's in our DNA.<\/strong><br><br>When a project is completed, we always ensure that the operation and maintenance of the facility does not just get off to a good start. Not least by offering well thought-out training, often in several stages. At our training centre in Kungsbacka, we have been training operating technicians and managers for decades. We also provide on-site training, always with the aim of utilising current technology in the best possible way.<br><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-cover\" style=\"min-height:247px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim\"><\/span><img fetchpriority=\"high\" decoding=\"async\" width=\"270\" height=\"470\" class=\"wp-block-cover__image-background wp-image-7608\" alt=\"engineering technical investigations\" src=\"https:\/\/enviroprocess.com\/wp-content\/uploads\/2024\/09\/ingenjors-tekniska-utredningar-1.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/enviroprocess.com\/wp-content\/uploads\/2024\/09\/ingenjors-tekniska-utredningar-1.jpg 270w, https:\/\/enviroprocess.com\/wp-content\/uploads\/2024\/09\/ingenjors-tekniska-utredningar-1-172x300.jpg 172w, https:\/\/enviroprocess.com\/wp-content\/uploads\/2024\/09\/ingenjors-tekniska-utredningar-1-7x12.jpg 7w\" sizes=\"(max-width: 270px) 100vw, 270px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Function &amp; performance<\/h2>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">EnviroProcess listens, acts and customises our solutions based on customer needs.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><br><strong>Sustainable Energy &amp; Environment Consultancy<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Through our energy and environmental consultancy, we review and ensure that environmental regulations are met and\/or exceeded. We look at how chemical use and energy consumption can be minimised while improving function and performance. By carefully analysing environmental impact and key parameters, we can then work with our clients to ensure sustainable choices and processes that last over time. We offer customised advice for each plant, and our close collaboration means that our solutions are not only tailored to current needs, but also equipped for future requirements.<\/p>","protected":false},"excerpt":{"rendered":"<p>Utredningar med fokus p\u00e5 funktion &amp; prestanda Vi p\u00e5 EnviroProcess lyssnar, analyserar, agerar och anpassar alltid v\u00e5ra l\u00f6sningar utifr\u00e5n kundernas behov. Genom v\u00e5ra Ingenj\u00f6rstekniska utredningar l\u00e4gger vi grunden f\u00f6r hur du s\u00e4kerst\u00e4ller att just din badanl\u00e4ggning fungerar och presterar optimalt \u00f6ver tid. Vi st\u00e4ller de r\u00e4tta fr\u00e5gorna och jobbar alltid n\u00e4ra v\u00e5ra kunder. Det ligger [&hellip;]<\/p>\n","protected":false},"featured_media":7611,"template":"","categories":[45],"topic":[79,81],"class_list":["post-9495","product","type-product","status-publish","has-post-thumbnail","hentry","category-tjanster","topic-engineering-studies","topic-energy-env-consult"],"acf":[],"_links":{"self":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/product\/9495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/media\/7611"}],"wp:attachment":[{"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/media?parent=9495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/categories?post=9495"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/enviroprocess.com\/en\/wp-json\/wp\/v2\/topic?post=9495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}