Malung Swimming Pool

Malung,

Sweden

Public pool

Malung has chosen steel pools instead of concrete and tiles, contributing to a 50% lower CO2 footprint and a more sustainable solution.

Complete swimming arena with family pool, spa and relaxation area

This project included a complete facility focused on providing a varied and family-friendly swimming experience. The swimming centre includes a children's play area, a spa and relaxation area with cold pool, whirlpool, and a heated outdoor pool, creating a relaxing and entertaining environment for visitors of all ages.

Partnering project with PEAB consisting of five wastewater treatment systems.

MISSIONS ACCOMPLISHED

- Project planning
- Delivery, installation and commissioning of the treatment plant
- Delivery and installation of three steel pools
(25-metre swimming pool, multi-purpose pool with movable intermediate floor and a warm relaxation pool with air bubbles in the benches
- Delivery of Kallpool "IceCube"
- Delivery of whirlpool "Roman public 255"
- Delivery and installation of customised castings for 3 concrete children's pools with waterproofing and tiles

Contact us

Email

Challenges to be addressed

Thanks to our extensive experience in design, installation and commissioning, we were able to deliver a complete swimming facility without major challenges. Our end-to-end solution ensured a smooth and efficient implementation from start to finish.

Solutions

In co-operation with PEAB, we delivered a modern swimming facility with steel pools, advanced water treatment and flexible solutions such as a movable intermediate floor. Our total responsibility, from design to commissioning, ensured an efficient and sustainable result.

interesting parts of the delivery

- Pressure filter, multilayer
- Load-dependent operation with cedox control
- Steel pools from Berndorf Bäderbau
- Movable intermediate floor, Malmsten Classic
- Flush water recycling, DINUF-recycle
- Chlorine manufacturer, NXT